Summary
- releng: Update e4.29 and eStaging targets to 2023-09 release (details)
- releng: Add Trace Compass 9.1.0 baseline (details)
- releng: Update OOMPH setup file for 9.1.0 (details)
- releng: Build with tracecompass-e4.29 target by default (details)
The file was modified | releng/org.eclipse.tracecompass.target/tracecompass-e4.29.target (diff) |
The file was modified | releng/org.eclipse.tracecompass.target/tracecompass-eStaging.target (diff) |
The file was removed | releng/org.eclipse.tracecompass.target/baseline/tracecompass-baseline-9.0.0.target |
The file was added | releng/org.eclipse.tracecompass.target/baseline/tracecompass-baseline-9.1.0.target |
The file was modified | TraceCompass.setup (diff) |
The file was modified | pom.xml (diff) |