Skip to content
Started 17 days ago
Took 1 hr 14 min

Build #814 (Apr 30, 2024, 11:18:32 PM)

Changes
  1. releng: Add e4.32 and update eStaging targets for 2024-06 M2 (details)

Started by upstream project tracecompass-master-nightly-base build number 406
originally caused by:

This run spent:

  • 20 sec waiting;
  • 1 hr 14 min build duration;
  • 1 hr 14 min total from scheduled to completion.
Revision: bb161aba7c453247151a24da1154ce9c4128dc2e
Repository: https://github.com/eclipse-tracecompass/tracecompass-infra.git
  • refs/remotes/origin/master
Revision: 721ebe4b5de1564a0c25b61606c9e77430017bfa
Repository: $GERRIT_REPOSITORY_URL
  • master
Test Result (no failures)