Started 11 mo ago
Took 59 min

Build #88 (Dec 10, 2021, 4:12:00 AM)

Changes
  1. releng: Update e4.22 and eStaging targets to 2021-12 release (details)

Started by timer

This run spent:

  • 29 sec waiting;
  • 59 min build duration;
  • 59 min total from scheduled to completion.
Revision: 43fd26da5cf50bb09c236eac7ba154c24aec26e9
Repository: https://git.eclipse.org/r/tracecompass/tracecompass-infra
  • refs/remotes/origin/master
Revision: 0a2929b979016e561f1fe0ce8fec6de7f0684349
Repository: $GERRIT_REPOSITORY_URL
  • stable-7.2
Test Result (no failures)