Started 9 mo 16 days ago
Took 1 hr 0 min

Build #68 (Sep 12, 2021, 4:12:00 AM)

Changes
  1. releng: Update e4.21 and eStaging targets for 2021-09 RC2 (details)

Started by timer

This run spent:

  • 16 sec waiting;
  • 1 hr 0 min build duration;
  • 1 hr 0 min total from scheduled to completion.
Revision: b03c720cc6798b46fc2074b4f0afabf0042ec433
Repository: https://git.eclipse.org/r/tracecompass/tracecompass-infra
  • refs/remotes/origin/master
Revision: 55a25473f32a149824454b7d96261fbf0f70d319
Repository: $GERRIT_REPOSITORY_URL
  • stable-7.1
Test Result (1 failure / +1)