Test Result : MasterSlaveNotationSyncTest
0 failures
(±0)
14 tests
(±0)
All Tests
Test name | Duration | Status |
---|---|---|
createNewNode:create | 1.9 sec | Passed |
createNewNode:redo | 0 ms | Passed |
createNewNode:undo | 0 ms | Passed |
deleteNode:deleteView | 2 sec | Passed |
deleteNode:redo | 0 ms | Passed |
deleteNode:undo | 0 ms | Passed |
initialSyncOfEmptyDiagram | 1.4 sec | Passed |
newNodeOfWrongMetaclassNotSynchronized | 1.5 sec | Passed |
syncNodeLocation:move | 2.2 sec | Passed |
syncNodeLocation:redo | 0 ms | Passed |
syncNodeLocation:undo | 0 ms | Passed |
syncNodeSize:redo | 0 ms | Passed |
syncNodeSize:resize | 1.4 sec | Passed |
syncNodeSize:undo | 0 ms | Passed |