Test Result : Scenario: Create scheduler with end date before start date

2 failures , 1 skipped
9 tests
Took 24 ms.

All Tests

Test nameDurationStatus
And A regular trigger creator with the name "triggerExample" is created0 msPassed
And An exception was thrown0 msSkipped
And I expect the exception "KapuaEndBeforeStartTimeException" with the text "*"0 msPassed
And The trigger is set to end on 09-10-2018 at 6:00.0 msPassed
And The trigger is set to start on 10-10-2018 at 6:00.0 msPassed
Given I create a job with the name "job1"0 msPassed
Scenario: Create scheduler with end date before start date12 msFailed
Then I create a new trigger from the existing creator with previously defined date properties12 msFailed
Then I find scheduler properties with name "Device Connect"0 msPassed