Test Result : Scenario: Create scheduler with correct end date

2 failures , 1 skipped
8 tests
Took 5 ms.

All Tests

Test nameDurationStatus
And A regular trigger creator with the name "triggerExample" is created0 msPassed
And No exception was thrown0 msSkipped
And The trigger is set to end on 12-10-2018 at 6:00.0 msPassed
And The trigger is set to start on 10-10-2018 at 6:00.0 msPassed
Given I create a job with the name "job1"0 msPassed
Scenario: Create scheduler with correct end date3 msFailed
Then I create a new trigger from the existing creator with previously defined date properties2 msFailed
Then I find scheduler properties with name "Device Connect"0 msPassed