Test Result : Scenario: Adding "Interval Job" Schedule With Non-Unique End Date Parameter

0 failures
16 tests
Took 15 ms.

All Tests

Test nameDurationStatus
And A regular trigger creator with the name "schedule1" is created6 msPassed
And I create a job with the name "job0"0 msPassed
And I create a new trigger from the existing creator with previously defined date properties0 msPassed
And I logout0 msPassed
And I set retry interval to 10 msPassed
And I set retry interval to 10 msPassed
And The trigger is set to end on 15-12-2020 at 10:10.0 msPassed
And The trigger is set to end on 15-12-2020 at 10:10.0 msPassed
And The trigger is set to start on 12-01-2020 at 10:10.0 msPassed
And The trigger is set to start on 12-12-2020 at 10:10.0 msPassed
Given I login as user with name "kapua-sys" and password "kapua-password"0 msPassed
Scenario: Adding "Interval Job" Schedule With Non-Unique End Date Parameter9 msPassed
Then A regular trigger creator with the name "schedule0" is created0 msPassed
Then I create a new trigger from the existing creator with previously defined date properties0 msPassed
Then No exception was thrown0 msPassed
When I find scheduler properties with name "Interval Job"0 msPassed